Aladdin Oil & Gas Company AS – AOGC – Well A on prospect 1 spudded

Aladdin Oil & Gas Company AS – AOGC – Well A on prospect 1 spudded
20
Feb
2007
Oil & Gas - 20 February, 2007

Well A on Prospect 1 on the Middle Sedolskaya Block was spudded Monday the 18th of February. It is estimated that the drilling will take 4-6 weeks.

This is the first well which is drilled based on the seismic data which was acquired in 2006, on which 15 structures have been mapped. 

The drilling is being conducted by Geotechnologia, using the company’s own rig and crew. The rig is advanced by Russian standards, including modern mudtreatment systems. This means that Geotechnologia has total operational andtechnical control. Total depth of the well is estimated around 700m or to basement.

Further information will be released when the well has been logged.

Post by ALEXIS KIM
Morbi turpis diam, posuere in blandit ut, tristique nec risus. Ut est purus, vehicula nec est ut, viverra lacinia nisi.

Comments

ALEXIS KIM reply
November 20, 2018
Morbi turpis diam, posuere in blandit ut, tristique nec risus. Ut est purus, vehicula nec est ut, viverra lacinia nisi.
ALEXIS KIM reply
November 20, 2018
Morbi turpis diam, posuere in blandit ut, tristique nec risus. Ut est purus, vehicula nec est ut, viverra lacinia nisi.
ALEXIS KIM reply
November 20, 2018
Morbi turpis diam, posuere in blandit ut, tristique nec risus. Ut est purus, vehicula nec est ut, viverra lacinia nisi.

Leave a Comment

© 2019 All Right Reserved. ARACA Energy A.S.A. Crafted by DATA